Table of Contents
Good sizing gives the valve enough pressure drop and rangeability to control at part load without excessive noise, cavitation or actuator demand at design flow. For electric control valve sizing, begin with “Define Minimum and Maximum Controlled Flow” and then “Determine Available Differential Pressure.” Together, “Define Minimum and Maximum Controlled Flow” and “Determine Available Differential Pressure” define the electric control valve sizing evidence needed before “Calculate the Required Valve Coefficient.”
After “Calculate the Required Valve Coefficient,” the electric control valve sizing workflow continues to “Check Valve Authority” and ends at “Review the Selection Across Operating Cases.” The move from “Calculate the Required Valve Coefficient” to “Review the Selection Across Operating Cases” explains the electric control valve sizing logic behind this H1.
Define Minimum and Maximum Controlled Flow
Use process or coil requirements across the real load range. Do not size only around the design maximum. Share “Define Minimum and Maximum Controlled Flow” evidence with the electric control valve sizing stakeholders. If “Define Minimum and Maximum Controlled Flow” misses its basis, revise the “Define Minimum and Maximum Controlled Flow” selection and record why.
- Verify use process or coil requirements across the real load range.
- Document do not size only around the design maximum.
Determine Available Differential Pressure
Calculate pressure at the valve for full and part-load pump conditions. Include other circuit losses and control strategy. Give “Determine Available Differential Pressure” a dedicated electric control valve sizing acceptance test. Preserve “Determine Available Differential Pressure” values and diagnostics for a repeatable “Determine Available Differential Pressure” check.
- Verify calculate pressure at the valve for full and part-load pump conditions.
- Document include other circuit losses and control strategy.

Calculate the Required Valve Coefficient
Use the correct liquid equation, units, density and pressure drop. Keep the calculation sheet linked to the selected operating points. Treat “Calculate the Required Valve Coefficient” as a complete electric control valve sizing decision. Recheck “Calculate the Required Valve Coefficient” against electric control valve sizing pipework, controls, interfaces and service access.
- Verify use the correct liquid equation.
- Document density and pressure drop.
- Compare keep the calculation sheet linked to the selected operating points.
Check Valve Authority
Compare valve pressure drop with the controlled circuit loss. Low authority makes installed response nonlinear and difficult to tune. Change one “Check Valve Authority” variable at a time during electric control valve sizing diagnosis. The “Check Valve Authority” baseline separates “Check Valve Authority” hardware, process and installation causes.
- Verify compare valve pressure drop with the controlled circuit loss.
- Document low authority makes installed response nonlinear and difficult to tune.

Evaluate Rangeability and Minimum Position
Confirm the selected trim can regulate the lowest useful flow above unstable seating or leakage regions. Close “Evaluate Rangeability and Minimum Position” with a named electric control valve sizing owner. For “Evaluate Rangeability and Minimum Position,” keep its photographs, configuration export and “Evaluate Rangeability and Minimum Position” comparison readings.
- Verify confirm the selected trim can regulate the lowest useful flow above unstable seating or leakage regions.
Screen for Cavitation and Noise
Review pressure, temperature and recovery characteristics. A coefficient match alone does not guarantee quiet, durable service. For “Screen for Cavitation and Noise,” the electric control valve sizing team ties assumptions to field evidence. Its “Screen for Cavitation and Noise” record names the source, unit and “Screen for Cavitation and Noise” exception owner.
- Verify temperature and recovery characteristics.
- Document a coefficient match alone does not guarantee quiet.
- Compare durable service.

Match the Actuator to Shutoff Conditions
Use maximum close-off pressure, valve force or torque, travel and required fail action. Verify the complete assembly. Use drawings and measurements to complete “Match the Actuator to Shutoff Conditions” in electric control valve sizing. A written “Match the Actuator to Shutoff Conditions” decision keeps installation and operations aligned.
- Verify use maximum close-off pressure.
- Document valve force or torque.
- Compare travel and required fail action.
- Confirm verify the complete assembly.
Review the Selection Across Operating Cases
Tabulate design, normal and minimum load with flow, pressure drop, opening and authority. Reject oversized choices that spend most operation near closed. A plausible “Review the Selection Across Operating Cases” result can hide a electric control valve sizing error. Store “Review the Selection Across Operating Cases” limits, test conditions and exception ownership.
- Verify normal and minimum load with flow.
- Document opening and authority.
- Compare reject oversized choices that spend most operation near closed.

Define Minimum and Maximum Controlled Flow Decision Table
| Decision | Evidence | Release condition |
|---|---|---|
| Define Minimum and Maximum Controlled Flow | Use process or coil requirements across the real load range | Release “Define Minimum and Maximum Controlled Flow” only after its electric control valve sizing evidence is accepted |
| Determine Available Differential Pressure | Calculate pressure at the valve for full and part-load pump conditions | Release “Determine Available Differential Pressure” only after its electric control valve sizing evidence is accepted |
| Calculate the Required Valve Coefficient | Use the correct liquid equation, units, density and pressure drop | Release “Calculate the Required Valve Coefficient” only after its electric control valve sizing evidence is accepted |
| Check Valve Authority | Compare valve pressure drop with the controlled circuit loss | Release “Check Valve Authority” only after its electric control valve sizing evidence is accepted |
| Evaluate Rangeability and Minimum Position | Confirm the selected trim can regulate the lowest useful flow above unstable seating or leakage regions | Release “Evaluate Rangeability and Minimum Position” only after its electric control valve sizing evidence is accepted |
Five Questions About “Review the Selection Across Operating Cases”
Which “Define Minimum and Maximum Controlled Flow” check comes first for electric control valve sizing?
Use process or coil requirements across the real load range. Do not size only around the design maximum.
Why does determine available differential pressure affect electric control valve sizing?
Calculate pressure at the valve for full and part-load pump conditions. Include other circuit losses and control strategy.
How should match the actuator to shutoff conditions be verified?
Use maximum close-off pressure, valve force or torque, travel and required fail action. Verify the complete assembly.
When must the electric control valve sizing basis be reviewed?
Review electric control valve sizing when inputs to “Define Minimum and Maximum Controlled Flow,” “Check Valve Authority” or “Match the Actuator to Shutoff Conditions” change.
Which details support “Determine Available Differential Pressure” in electric control valve sizing?
For electric control valve sizing, provide the inputs for “Define Minimum and Maximum Controlled Flow,” the constraints from “Determine Available Differential Pressure” and the evidence expected under “Match the Actuator to Shutoff Conditions.”
Before approving “Define Minimum and Maximum Controlled Flow,” revisit its project assumptions. Use process or coil requirements across the real load range. Do not size only around the design maximum. Record the resulting “Define Minimum and Maximum Controlled Flow” decision and any site-specific “Define Minimum and Maximum Controlled Flow” exception.
Before approving “Determine Available Differential Pressure,” revisit its project assumptions. Calculate pressure at the valve for full and part-load pump conditions. Include other circuit losses and control strategy. Record the resulting “Determine Available Differential Pressure” decision and any site-specific “Determine Available Differential Pressure” exception.
Before approving “Calculate the Required Valve Coefficient,” revisit its project assumptions. Use the correct liquid equation, units, density and pressure drop. Keep the calculation sheet linked to the selected operating points. Record the resulting “Calculate the Required Valve Coefficient” decision and any site-specific “Calculate the Required Valve Coefficient” exception.
Technical references for “Define Minimum and Maximum Controlled Flow” include IEC Standards for “Define Minimum and Maximum Controlled Flow”, US DOE Pumping Systems for “Determine Available Differential Pressure”, CIBSE Knowledge Portal for “Calculate the Required Valve Coefficient”, ISA Standards for “Check Valve Authority”. The project specification should name the applicable edition and local rules.
Dingjia options supporting “Determine Available Differential Pressure” include the intelligent control valve for “Define Minimum and Maximum Controlled Flow”, on/off controller for “Determine Available Differential Pressure”, flanged regulating valve for “Calculate the Required Valve Coefficient”, electric control valve for “Check Valve Authority”. For “Determine Available Differential Pressure,” send operating conditions and interface requirements to the engineering team before selection. The inquiry should also assign responsibility for “Evaluate Rangeability and Minimum Position” and “Screen for Cavitation and Noise.”